About Us
CYG Insulator Co., Ltd. is a national high-tech enterprise controlled by Changyuan Technology Group Co., Ltd. (stock abbreviation: Changyuan Group, stock code: 600525. SH).
State Grid UHV expert group visited CYG Insulator for inspection
On February 24, 2023, State Grid UHV expert group visited CYG Insulator to inspect the supply of insulators for the Zhumadian-Wuhan UHV transmission project line.
CYG Insulator assists in the successful meeting of the Electric Power Insulator Industry Standard Committee
On May 25, 2023, the 4th working meeting of the Electric power Industry Insulator Standardization Technical Committee was held in Dongguan City. More than 70 attendees from the China Electric Power Academy of Sciences, China Electric Power Union, Tsinghua University, State Grid electric Power Science Research Institute leaders, experts and representatives of the national power insulator manufacturers participated in the meeting. The meeting was chaired by Mr. Wu Guangya, director of China Electric Power Research Institute.
CYG Insulator won "The first batch of Individual Champion Enterprises in Dongguan City"
In August 2023, the Dongguan Municipal Bureau of Industry and Information Technology announced the "List of the first batch of manufacturing single champion enterprises (products) in Dongguan", and CYG Insulator was selected in the list.
Summer Cooling Activity
On August 8, 2023, on the occasion of the Start of Autumn, the company carried out a "Pay tribute to the staff who stick to the front line" CYG 2023 summer cooling activity. The company sent out 300+ cups of frozen plum juice, expressing the company's deep love for the majority of employees.
Major projects of State Network and Southern Network
1) Yueyang, Hunan to Nanning, Guangxi 500 kV power transmission and transformation project: The project, with a total length of about 970 kilometers and 500 kV transmission technology, is a long-distance cross-provincial power transmission channel, led by the State Grid Corporation, and is expected to invest about 2 billion yuan. The project is scheduled to complete the preliminary work by the end of 2021, is expected to start in 2022, and the construction period is expected to be three years.
Major UHV projects in China
1) Guizhou Anshun, Guizhou Longli, Guangxi Hepu, Guangdong Zhanjiang UHV DC inter-provincial networking project: The project line length of about 1500 kilometers, using ±1100 kV UHVDC transmission technology, is expected to invest about 36 billion yuan, led by the State Grid Corporation, is expected to start in 2022, 2025 completion.
About Us
CYG Insulator Co., Ltd. is a national high-tech enterprise controlled by Changyuan Technology Group Co., Ltd. (stock abbreviation: Changyuan Group, stock code: 600525. SH).
Partners